Yiwu Shenneng Renewable Resources Utilization Co., Ltd. is located in Yutangkeng, Fotang Town, Yiwu City, Zhejiang Province, the project covers an area of about 81.25 acres, with a total investment of 347 million yuan (of which 217 million yuan). The project is mainly responsible for Yiwu City, kitchen waste, food waste, gutter oil collection and transportation and resource utilization, the construction and implementation of two phases, a kitchen waste 100t / d, gutter oil 30t / d, food waste 100t / d, the second phase of the kitchen waste to reach 250t / d, kitchen waste 250t / d, a total of 530t / d. After the project is put into operation, the annual treatment of the first phase, the annual treatment of the first phase, the first phase, the first phase, the first phase, the first phase, the first phase, the first phase, the first phase, the first phase.
After the project is put into operation, the first phase will process 84,000 tons of garbage annually, generate 8 million degrees of electricity annually, and produce 4,745 tons of crude oil and grease annually; the second phase will process 193,450 tons of garbage annually, generate 35 million degrees of electricity annually, and produce 5,840 tons of crude oil and grease annually.
It adopts the integrated operation mode of collection, transportation and disposal, integrating intelligent collection and transportation, DCS automatic control system and WIS standardized management system to realize automatic operation and maintenance. The advanced food waste informationization supervision platform is built to assist the operation, realizing that the process of vehicle entering the plant, weighing, route navigation, intelligent unloading and other processes can be automated; through the DCS automatic control system, it realizes the one-button start-stop operation of food waste disposal in the central control room and improves the industry's auto-control level: the introduction of WIS standardized management system realizes that the food waste disposal, operation and maintenance are all processed and analyzed on-line, The introduction of WIS standardized management system realizes online processing, online analysis, and online ordering of tasks, which achieves the purpose of precise operation and control of food waste plants and improves the operation and maintenance management level of the whole industry.
The internal management system of the company adopts Waste Incineration Plant Information System (WIS), which is the original system of Shenneng Environmental Protection, and is based on the mature MIS system of thermal power plants, combined with the characteristics of waste incineration and power generation, and integrated into the WIS system. The WIS system is based on the MIS system of mature coal-fired power plants and combines the characteristics of waste incineration power generation with the data acquisition of the equipment inspection system, online reception of real-time data from the plant-level supervisory information system (SIS) of the power plant to realize dynamic monitoring and innovatively integrates industry standards, enterprise standards, product standards and behavioral standards. All the auditing processes are consolidated on the platform after being validated by the group company and all the subsidiaries carry out production and daily work in accordance with the unified and standardized processes. Communication, to facilitate work handover, conducive to job data preservation, the use of work experience accumulation, greatly enhancing corporate efficiency.